Debris Removal Update February 20, 2017

Below is the 2/20/2017 summary of Beaufort County debris removal and hazardous tree removal operations:

Vegetative and C&D Debris Removal Operation:

  • Total:  132 loads / 6,844  Cubic Yards (*Including 113 loads / 5718.20 CYD from Daufuskie Island)
  • Vegetative/Wood – 6,844 CY (*Including 5718.20 CYD from Daufuskie Island)
  • Construction & Demolition 0 CY (*Including 0 CYD from Daufuskie Island)
  • Uprooted Stumps – 0 CY (*Including 0 CYD from Daufuskie Island)

Haul-Out Operation:

  • Total:  31 loads / 3,209 Cubic Yards (*Including 0 loads / 0 CYD from Daufuskie Island)

LHS Hazardous Tree Removal Operation:

  • 49 total tickets issued (*Including 0 total from Daufuskie Island)
  • Hazardous Limbs – 48 (*Including 0 from Daufuskie Island)
  • Hazardous Trees – 1 (*Including 0 from Daufuskie Island)

*Please note – Stump totals on the LHS Status Report are indicative of completely uprooted stumps collected on a cubic yardage basis and not stump extractions. There were 0 completely uprooted stumps (0 CY) collected today.

Attached are the PDF reports for Unit Rate and Load tickets in order to document field operation and daily/cumulative totals. Please note all figures are pending final reconciliation with the contractor.

2017-02-20_BeaufortCounty_DebrisRemovalStatus

2017-02-20_BeaufortCounty_LHSStatus

2017-02-20_BeaufortCounty_ProjectHauloutSummary