Debris Removal Update February 13, 2017

Below is the 2/13/2017 summary of Beaufort County debris removal and hazardous tree removal operations:

Vegetative and C&D Debris Removal Operation:

  • Total:  99 loads / 5,024  Cubic Yards (*Including 88 loads / 4480.60 CYD from Daufuskie Island)
  • Vegetative/Wood – 5,024 CY (*Including 4480.60 CYD from Daufuskie Island)
  • Construction & Demolition 0 CY (*Including 0 CYD from Daufuskie Island)
  • Uprooted Stumps – 0 CY (*Including 0 CYD from Daufuskie Island)

Haul-Out Operation:

  • Total:  23 loads / 2,291 Cubic Yards (*Including 0 loads / 0 CYD from Daufuskie Island)

LHS Hazardous Tree Removal Operation:

  • 51 total tickets issued (*Including 0 total from Daufuskie Island)
  • Hazardous Limbs – 51 (*Including 0 from Daufuskie Island)
  • Hazardous Trees – 0 (*Including 0 from Daufuskie Island)

*Please note – Stump totals on the LHS Status Report are indicative of completely uprooted stumps collected on a cubic yardage basis and not stump extractions. There were 0 completely uprooted stumps (0 CY) collected today.

Attached are the PDF reports for Unit Rate and Load tickets in order to document field operation and daily/cumulative totals. Please note all figures are pending final reconciliation with the contractor.

2017-02-13_BeaufortCounty_DebrisRemovalStatus

2017-02-13_BeaufortCounty_ProjectHauloutSummary