Debris Removal Update February 8, 2017

Below is the 2/8/2017 summary of Beaufort County debris removal and hazardous tree removal operations:

Vegetative and C&D Debris Removal Operation:

  • Total:  120 loads / 6,102  Cubic Yards (*Including 92 loads / 4586.50 CYD from Daufuskie Island)
  • Vegetative/Wood – 6,085 CY (*Including 4586.50 CYD from Daufuskie Island)
  • Construction & Demolition 0 CY (*Including 0 CYD from Daufuskie Island)
  • Uprooted Stumps – 17 CY (*Including 0 CYD from Daufuskie Island)

Haul-Out Operation:

  • Total:  20 loads / 1945.15 Cubic Yards (*Including 0 loads / 0 CYD from Daufuskie Island)

LHS Hazardous Tree Removal Operation:

  • 121 total tickets issued (*Including 0 total from Daufuskie Island)
  • Hazardous Limbs – 113 (*Including 0 from Daufuskie Island)
  • Hazardous Trees – 8 (*Including 0 from Daufuskie Island)

*Please note – Stump totals on the LHS Status Report are indicative of completely uprooted stumps collected on a cubic yardage basis and not stump extractions. There were 1 completely uprooted stumps (17 CY) collected today.

Attached are the PDF reports for Unit Rate and Load tickets in order to document field operation and daily/cumulative totals. Please note all figures are pending final reconciliation with the contractor.

2017-02-08_BeaufortCounty_DebrisRemovalStatus

2017-02-08_BeaufortCounty_LHSStatus