Debris Removal Update January 19, 2017

Below is the 1/19/2017 summary of Beaufort County debris removal and hazardous tree removal operations:

Vegetative and C&D Debris Removal Operation:

  • Total:  254 loads / 12,974 Cubic Yards (*Including 135 loads / 6782.75 CYD from Daufuskie Island)
  • Vegetative/Wood – 12,974 CY (*Including 6782.75 CYD from Daufuskie Island)
  • Construction & Demolition – 0 CY(*Including 0 CYD from Daufuskie Island)
  • Uprooted Stumps – 84 CY (*Including 0 CYD from Daufuskie Island)

LHS Hazardous Tree Removal Operation:

  • 50 total tickets issued (*Including 0 total from Daufuskie Island)
  • Hazardous Limbs – 47  (*Including 0 from Daufuskie Island)
  • Hazardous Trees – 3 (*Including 0 from Daufuskie Island)

*Please note – Stump totals on the LHS Status Report are indicative of completely uprooted stumps collected on a cubic yardage basis and not stump extractions. There were 10 completely uprooted stumps (84 CY) collected today.

Attached are the PDF reports for Unit Rate and Load tickets in order to document field operation and daily/cumulative totals. Please note all figures are pending final reconciliation with the contractor.

2017-01-18_BeaufortCounty_DebrisRemovalStatus

2017-01-18_BeaufortCounty_LHSStatus